Fontaine Bros., Inc.

Demo data

Command

Strategy

The Northstar, objectives, and the assumption register with live threshold status, the drift alerts, and the signal map.

What this shows

Threshold status is computed live; with no company data connected, assumptions read "pending" until their signal connects. A separate early-warning monitor for sudden shifts is not shown here yet.

Northstar

Purpose
Deliver every public project on quality, on schedule, and on budget.
Vision
Reliability compounds into reputation, self-perform margin, and public trust.
Mission
Make schedule, cost, quality, safety, cash, and trust visible early enough for human control.
Aspiration
Become the public-construction operating system for reliable delivery at scale.

Objectives

  • Deliver every project to quality, on schedule, and on budget.

    Outcome: On-time, on-budget, defect-free delivery rate

  • Protect safety, occupied-campus trust, and delivery reputation.

    Outcome: Incident-free record; owner satisfaction; reference and rebid rate

  • Preserve Fontaine margin and cash conversion while labor and materials stay volatile.

    Outcome: Fee and margin vs baseline; cash conversion; EAC accuracy

  • Make self-perform craft capacity and productivity visible and controllable.

    Outcome: Self-perform margin vs bid; craft utilization

  • Build institutional memory that survives project turnover and generational transition.

    Outcome: Decision-lineage completeness; lessons-learned reuse rate

Assumption register (live threshold status)

AssumptionObjectiveThreshold metricLimitStatus
Schedule slips are visible early enough to recover the dateDeliver every project to quality, on schedule, and on budget.Critical-path variance1Pending company data
Budget/GMP deviations are caught through change control and EAC, not at closeoutDeliver every project to quality, on schedule, and on budget.Variance beyond band vs GMP1Pending company data
Quality defects are caught and clustered before turnoverDeliver every project to quality, on schedule, and on budget.Defect pattern at turnover window1Pending company data
Occupied-campus separation holds on active school sitesProtect safety, occupied-campus trust, and delivery reputation.Any breach1Pending company data
Focus Four and hazmat hazards are stopped and corrected, never auto-clearedProtect safety, occupied-campus trust, and delivery reputation.Any open high-severity hazard1Pending company data
Owner actions and community concerns close before they become trust issuesProtect safety, occupied-campus trust, and delivery reputation.Action overdue past SLA1Pending company data
Change is noticed within the contractual clockPreserve Fontaine margin and cash conversion while labor and materials stay volatile.Notice window closing unactioned1Pending company data
Cost-to-complete is forecast, not discovered at month-endPreserve Fontaine margin and cash conversion while labor and materials stay volatile.Variance beyond band1Pending company data
Public-work cash keeps moving through pay apps, waivers, certifieds and reimbursementPreserve Fontaine margin and cash conversion while labor and materials stay volatile.Missing backup, denial, or exception1Pending company data
Own-crew productivity is measured against a standardMake self-perform craft capacity and productivity visible and controllable.Variance beyond bid standard1Pending company data
Craft capacity is matched to demand across the portfolioMake self-perform craft capacity and productivity visible and controllable.Demand exceeds qualified capacity1Pending company data
Own-crew certified payroll and safety are compliantMake self-perform craft capacity and productivity visible and controllable.Exception or hazard1Pending company data
Every load-bearing decision is logged with predicted vs actualBuild institutional memory that survives project turnover and generational transition.Close without outcome1Pending company data
Recurring issues cluster to a systemic fixBuild institutional memory that survives project turnover and generational transition.Pattern repeats past threshold1Pending company data
No figure reaches a human without source and FACT/EST/GAP tagBuild institutional memory that survives project turnover and generational transition.Number lacks source1Pending company data

Strategy-drift alerts

No threshold breaches. (Append ?demo=breach to see a live routed breach.)

Signal map

Each signal routes to its assumption, objective, and money node. A breached route is highlighted.

  • Critical-path slip Deliver every project to quality, on schedule, and on budget. Fulfill
  • Pipeline stage movement Preserve Fontaine margin and cash conversion while labor and materials stay volatile. Acquire
  • EAC variance Deliver every project to quality, on schedule, and on budget. Fulfill
  • Field deficiency pattern Deliver every project to quality, on schedule, and on budget. Fulfill
  • Sub-market coverage Deliver every project to quality, on schedule, and on budget. Convert
  • Occupied-campus separation breach Protect safety, occupied-campus trust, and delivery reputation. Retain
  • Focus Four hazard Protect safety, occupied-campus trust, and delivery reputation. Retain
  • Owner action aging Protect safety, occupied-campus trust, and delivery reputation. Retain
  • Change notice deadline Preserve Fontaine margin and cash conversion while labor and materials stay volatile. Cash
  • Margin erosion Preserve Fontaine margin and cash conversion while labor and materials stay volatile. Cash
  • Pay-app evidence gap Preserve Fontaine margin and cash conversion while labor and materials stay volatile. Cash
  • Self-perform productivity variance Make self-perform craft capacity and productivity visible and controllable. Fulfill
  • Binding constraint shift Deliver every project to quality, on schedule, and on budget. Fulfill
  • Crew allocation conflict Make self-perform craft capacity and productivity visible and controllable. Fulfill
  • Own-crew certified payroll exception Make self-perform craft capacity and productivity visible and controllable. Cash
  • Decision-log completeness breach Build institutional memory that survives project turnover and generational transition. Convert
  • Root-cause cluster Build institutional memory that survives project turnover and generational transition. Fulfill
  • Unsupported AI number Build institutional memory that survives project turnover and generational transition. Convert
  • Integration freshness Build institutional memory that survives project turnover and generational transition. Convert