Scenario readiness
Seeded
Directional, no target set
Fontaine Bros.
Command Center
Constraint Fulfill execution capacity is primary; Cash certified payroll and reimbursement discipline is secondary.
Cadence: monthly and on decision request
About this engine
What-If groups its work into operator-readable control loops, with source state kept separate from risk status.
Key performance indicators
Scenario readiness
Seeded
Directional, no target set
What this engine drives
As of latest, not yet time-awareWhat-If protects O1
What-If protects O3
What-If protects O4
Confirm the current What-If decision path before action.
Select one move, review the evidence, then record the posture.
Influences: Scenario readiness
Operating move
About this move
Labor scarcity shock supports the What-If operating review.
Runs now on modeled or proxy inputs. Not calibrated.
This move runs on modeled or proxy inputs. Run the demo to see the base-computed result. Not calibrated.
Clear state
Confirm evidence, owner, and next step before action.
all objectives
Pick a posture, then add a note and save. Each option explains itself.
Simulation readiness
10 runnable now; 0 configured for review.
Runnable modes use modeled inputs and remain advisory until connected data and calibration are present. Configured modes show data needs and do not produce results.
War game · Demo data
Twins are modeled from public positioning and category proxies — illustrative, not calibrated. The solver plays the game for real; the inputs are demo estimates.
Competitor twin
Exposed assumption: Fontaine can keep best-fit work, delivery reliability, and public-owner trust under market pressure.
Pre-approved counter: Run bid discipline, reference engine, and delivery-control review before committing capacity.
Shock
Intensity
Intensity applies once a shock is selected.
Cascade trace
Source
Source and estimate states stay visible before decisions.
Control
Each card names the owner and action path.
Decision
Decisions feed the learning loop after the outcome is known.