Fontaine Bros.

Seeded data
Portfolio riskWatchData freshnessPending feedsOpen decisionsOperator reviewUpside firedReviewed separatelyOperator view

Fontaine Bros. Command

Operator command
SeededPartial

Every project on quality, on schedule, on budget.

Live control of delivery, safety, crews, and cash across the active public portfolio. Estimates stay visibly marked until Fontaine systems connect.

On-time delivery

Pending

days over owner threshold

Project Delivery schedule feed is not connected; keep the delivery read pending.

Target: 1 day owner review threshold

Unlock: Company data ask: connect I03 schedule fields.

As of latest, not yet time-aware

Reads: Quality, schedule, and budget

High-severity hazards

1

open hazards

Safety has one seed-real high-severity hazard requiring owner review.

Target distance: 1 from 0

As of latest, not yet time-aware

Reads: Safety, campus trust, and reputation

Cash cycle

Pending

pay-app cycle days

Getting Paid cash-cycle evidence is not connected; keep the cash read pending.

Target: 0 missing backup, denial, or exception

Unlock: Company data ask: connect I01/I11 pay-app, waiver, certified-payroll, and reimbursement evidence.

As of latest, not yet time-aware

Reads: Margin and cash conversion

Budget position

Pending

EAC variance

Cost & Margin budget-basis evidence is not connected; keep the delivery and cash-conversion read pending.

Target: inside funding basis

Unlock: Company data ask: connect I01 job-cost and EAC fields.

As of latest, not yet time-aware

Reads: Margin and cash conversion

Crew productivity

Pending

units per labor hour

Our Crews productivity feed is not connected; keep the productivity read pending.

Target: bid standard

Unlock: Company data ask: connect I09 labor productivity fields.

As of latest, not yet time-aware

Reads: Self-perform productivity

Decision lineage

2

open decision records

watch

Seed-real decision log store shows two open decision cases; decision memory remains under review.

Target distance: 2 from 0

As of latest, not yet time-aware

Reads: Institutional memory

Binding constraint

Watch

status

watch

Strategy Room carries the current binding-constraint status.

Target: stable constraint

As of latest, not yet time-aware

Reads: Binding constraint

Catalogue posture

21 live / 8 blocked

seed-real options

Catalogue seed counts live options and blocked vetoes as separate posture evidence.

Target: live options with blocked vetoes separate

As of latest, not yet time-aware

Reads: Binding constraint

Feed freshness

2

feeds past target

blocked

Seed-real data-feed monitor shows two feeds past target; unsupported readings stay pending until sources connect.

Target distance: 2 from 0

As of latest, not yet time-aware

Reads: Institutional memory

Control tower state

premium operator command surface

partial

Portfolio risk

Watch

Portfolio risk is tied to quality, schedule, and budget.

As of latest, not yet time-aware

Data freshness

Pending feeds

Data freshness is tied to institutional memory.

As of latest, not yet time-aware

Open decisions

Operator review

Open decisions are tied to margin and cash conversion.

As of latest, not yet time-aware

Upside fired

Reviewed separately

Upside review is tied to self-perform productivity.

As of latest, not yet time-aware
Operating spine

Where pressure sits across the operating stages

The operating stages are the constant spine; engines branch off as ribs; colour is the live status; the one pulsing node is the surfaced decision.

1Winning Work
2Bidding & Estimating
3Project Delivery
4Owner & Community
5Getting Paid
ACQUIRErelationship coverage · public opportunity scanning · segment fit · proposal proofCONVERTbid/no-bid · estimating · coverage · design assist · GMP alignmentFULFILLprecon · buyout · schedule · field · closeout · self-perform laborRETAINowner satisfaction · community trust · records · referencesCASHpay apps · certified payroll · reimbursement · retainage · claims · closeout cashNORTHSTAR
NorthstarDeliver every project to quality, on schedule, and on budget.

Engine map

Operating surfaces

public project value unit: CM/GC fee, self-perform trade margin, change-order value, and general-conditions recovery by project, owner channel, trade, or month.

Signal feed

Signals tied to assumptions

DemoPartial
As of Month 01

pipeline stage movement

S1

Pipeline and pursuit workbook

Watchinternal

Pending: no signal row has entered this month.

Month 01

Pending

budget delta vs funding basis

S2

Estimating and funding basis workbook

Watchinternal

Pending: no signal row has entered this month.

Month 01

Pending

critical path slip

S3

Critical-path variance

ClearProject Manager

Value 0.30, below its 1 threshold.

2026-01

Clear / Fontaine operating feed

owner action aging

S4

Action overdue past SLA

WatchProject Manager

Pending: no signal row has entered this month.

Month 01

Pending

pay app evidence gap

S5

Missing backup, denial, or exception

WatchController

Pending: no signal row has entered this month.

Month 01

Pending

Detailed readout

On-time delivery

Pending

days over owner threshold

Project Delivery schedule feed is not connected; keep the delivery read pending.

Target: 1 day owner review threshold

Unlock: Company data ask: connect I03 schedule fields.

As of latest, not yet time-aware

High-severity hazards

1

open hazards

Safety has one seed-real high-severity hazard requiring owner review.

Target distance: 1 from 0

As of latest, not yet time-aware

Cash cycle

Pending

pay-app cycle days

Getting Paid cash-cycle evidence is not connected; keep the cash read pending.

Target: 0 missing backup, denial, or exception

Unlock: Company data ask: connect I01/I11 pay-app, waiver, certified-payroll, and reimbursement evidence.

As of latest, not yet time-aware

Budget position

Pending

EAC variance

Cost & Margin budget-basis evidence is not connected; keep the delivery and cash-conversion read pending.

Target: inside funding basis

Unlock: Company data ask: connect I01 job-cost and EAC fields.

As of latest, not yet time-aware

Crew productivity

Pending

units per labor hour

Our Crews productivity feed is not connected; keep the productivity read pending.

Target: bid standard

Unlock: Company data ask: connect I09 labor productivity fields.

As of latest, not yet time-aware

Decision lineage

2

open decision records

watch

Seed-real decision log store shows two open decision cases; decision memory remains under review.

Target distance: 2 from 0

As of latest, not yet time-aware

Binding constraint

Watch

status

watch

Strategy Room carries the current binding-constraint status.

Target: stable constraint

As of latest, not yet time-aware

Catalogue posture

21 live / 8 blocked

seed-real options

Catalogue seed counts live options and blocked vetoes as separate posture evidence.

Target: live options with blocked vetoes separate

As of latest, not yet time-aware

Feed freshness

2

feeds past target

blocked

Seed-real data-feed monitor shows two feeds past target; unsupported readings stay pending until sources connect.

Target distance: 2 from 0

As of latest, not yet time-aware

Cascade trace

Fontaine operating chain

01

Win

Watch

Pursuit fit

Keep coverage, bid discipline, and relationships pointed at best-fit public work.

02

Plan

Watch

Estimate and budget basis

Hold estimating, trade coverage, and escalation before work starts.

03

Deliver

Risk

Schedule, safety, and crews

Run delivery, campus protection, and crew allocation as one control loop.

04

Get paid

Watch

Cash and change control

Keep pay apps, certifieds, reimbursement, and claims moving.

05

Learn

Blocked

Decision memory

Protect data freshness, provenance, and lessons that survive project turnover.